Lifting Equipment Failures: Lessons from Real Incidents

LOLER training

Lifting operations are inherently hazardous because they involve work at height. Someone can fall over, cranes can collapse, and objects placed at a higher level can hit someone in the the head. 

This is why lifting operations are tightly controlled in the UK. But accidents still happen, and investigations reveals that most are preventable. They happen not because carelessness by a single worker, but because of failures in the systems that allow for conditions that make safety accidents more likely. 

The Human Cost of Complacency

In 2023, the Health and Safety Executive (HSE) reported that construction and manufacturing continued to make up a large share of workplace deaths in the UK. Many of those incidents involved lifting equipment, including mobile cranes, overhead gantries, forklift trucks, and accessories like chains, slings, and shackles. But these are not just numbers in a report. Each one represents a person who trusted the equipment they were using was safe, and an employer with a duty to make sure it was. 

When an accident occurs, it looks as if it came out of nowwhere. But when investigations look at what was actually going on, they typically find multiple factors that made the accident not just likely but predicable. 

There’s rarely ever a single cause. More often, it’s small oversights at multiple stages that compound into increased risk. Let us look at some of the most common places where things go wrong.

Overloading

Perhaps no cause of lifting equipment failure is more prevalent — or more avoidable — than overloading. Time and again, incident reports describe scenarios in which operators attempted to lift loads that exceeded the safe working load (SWL) of the equipment. In some cases, the load weight was never calculated at all. In others, operators relied on rough estimates rather than verified figures.

A crane collapse at a UK construction site shows just how important proper lift planning is. The crane’s load chart made its safe capacity at that working radius clear, but the lift still went ahead with a load that was almost 15% too heavy. The extra strain caused the structure to buckle, and the boom collapsed into an occupied area. Investigators later found there had been no lift plan, no approval from an appointed person, and no proper briefing for the operator on the load’s weight or centre of gravity.

The lesson is clear: every lift must be planned, starting with an accurate load weight and the crane’s capacity at the actual working radius.

Inspection Failures and Hidden Defects

Lifting equipment deteriorates over time as a normal consequences of use. The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) requires periodic thorough examinations by competent persons to ensure it stays safe for work. Failures to conduct these inspections properly are a recurring theme in incident investigations.

In one notable case, a multi-leg chain sling failed during a routine lift at a steel fabrication yard. The sling’s master link fractured without warning, dropping several tonnes of structural steel onto the ground below. Forensic examination revealed that the link had suffered progressive fatigue cracking over many months. The cracks were visible to the naked eye and would almost certainly have been detected during a proper thorough examination. However, the sling had not been examined for over a year — well beyond the six-month interval required by LOLER for equipment used to lift people and the standard schedules set out in most examination schemes.

Those responsible for inspecting lifting equipment must be know what the law expects from them. Recognised LOLER training provide them with this knowledge in a manner that’s easy to understand and implement.

Poor Communication and Lack of Planning

Lifting failures are not always mechanical. A significant proportion of incidents stem from organisational failures — particularly poor communication between the people involved in a lift. Banksmen who cannot see the operator, riggers who are not briefed on the lift sequence, and supervisors who assume someone else has checked the equipment are all recurring characters in investigation reports.

At a port facility, a container was being lifted by a ship-to-shore crane when things went wrong. The operator was given conflicting signals by two members of the ground team, hesitated, and then moved the load the wrong way. The container hit a nearby stack, knocking one unit loose and sending it onto a vehicle below. Thankfully, the driver escaped with only minor injuries, but the outcome could easily have been far worse.

This is why lift planning has to go beyond paperwork. Everyone involved needs a clear role, a shared understanding of how the lift will be carried out, and a reliable way to communicate throughout. Just as importantly, they need to know what to do if something starts to go wrong. 

Inadequate Training and Supervision

Many of the failures described above come back to one basic issue: a lack of proper training and competence. If an operator cannot read a load chart properly, they are far more likely to overload equipment. If a supervisor has never been shown how to put together a lift plan, that plan may never be created. And if an inspector does not know what signs of fatigue cracking look like, damaged equipment may be passed as safe when it is not. 

Regulatory enforcement consistently highlights training gaps as a root cause. HSE improvement and prohibition notices frequently cite failures to ensure that personnel are competent to carry out the tasks assigned to them. Competence is not simply a matter of experience — it requires formal, structured education in the principles of safe lifting, the legal requirements that govern it, and the practical skills needed to apply both on the ground.

Building a Culture of Vigilance

The clearest lesson from real lifting incidents is that safety is not something you achieve once and then move on from. It has to be maintained every day through attention, investment, and accountability at every level of the organisation. 

Equipment must be selected correctly, maintained diligently, and examined thoroughly. Lifts must be planned methodically and supervised by competent individuals. And when something does go wrong — even if no one is hurt — it must be investigated honestly and the findings acted upon.